Another day training but a wee surprise halfway through.....
 |
The tyre definitely made an impression on the airstrip at Dimbulah
|
 |
No puncture kit is going to fix this one
|
 |
MEP in need of some TLC
|
 |
Simon and Tim were able to pull the aircraft off the airstrip and then organise for an engineer to come and replace the tyre
|
 |
Help has arrived. Thankful for MAF engineers and for their invaluable skills to keep the aircraft in the air. Thankfully this 208 was due for a inspection including tyre changes so good timing.
|

No time to waste as there is always paperwork to be completed